The manual of universal soil feeder used in earthwork
excavation and topsoil conveying project
Foreword:
The universal soil feeder is widely used in the excavation
of large deep foundation pit, the construction and restoration of lake, the
transportation of soil on the earthwork, especially the cleaning of underwater
materials, earthwork,
water conservancy dredging engineering standing equipment .
Section 1 , Scope of application:
Suitable for the whole excavation process, from the excavation of flat
ground to the
formation of deep pits to the seepage of groundwater.
When local water seepage, there is no need to increase pumping and
drainage operations, no need to build temporary replacement transport
muck road, no need
to build artificial work platform at the bottom of the pit.
depth, range and Angle can be adjusted arbitrarily according to the
site conditions.
Working parameters:
●Transverse
extension span: 10-1000m
●Depth of
exvavation:0-200m
●Slope of
foundation pit edge:0-90°
●100m
efficiency: small 100 tons/h, medium 450 tons/h, large 1300tons/h
●50m
efficiency: small 200 tons/h, medium 900 tons/h, large 2600 tons/h
Type Price
|
TYPE |
PRICE US$ |
FORM |
AFTER
SERVICE |
|
SFU-100 |
90000.00 |
Universal |
N |
|
SFU-200 |
180000.00 |
Universal |
N |
|
SFU-500 |
820000.00 |
Universal |
N |
|
SFU-1000 |
1540000.00 |
Universal |
N |
|
SFU-1500 |
26000000.00 |
Universal |
N |
|
SFU-2000 |
38000000.00 |
Universal |
N |
The feature of this construction machine is that when working alone,
it is a single-machine dragline excavator. The pulley controlling the
bucket cable can move up and down the lifting arm, thus increasing
the working radius of the dragline excavator. When excavating as a
dragline excavator, the radius of excavation can be up to 40 meters.
Therefore, when there is no seepage of underground water in the foundation pit,
a single machine is used to excavate and directly soil to the feeding mouth of
the conveyor. It is characterized by simple operation, flexible steering, convenient
movement, low cost and can be constructed at the bottom of the
foundation pit (figure 1).
directly adopt the form of large-span all-in-one excavating
machine (figure 2).
When underground water seepage occurs during excavation,
adjust the position of the working cable pulley on the lifting arm,
and at the same time set up the support frame supporting the
guide rail ropeway on the opposite side of the excavation area,
which can form a large span variable amplitude combined pull
shovel
excavation soil transfer system (figure 2).
This technology can select and configure different working terminals
according to the geographic landform and the structural requirements
of the bottom of the foundation pit. It mainly has the following four
functions: shovel, dig, grab and lift. The process of excavation,
stripping, cutting, lifting, turning, dumping and soil loading can
be adjusted and changed according to the design requirements of
the bottom of the foundation pit.
(figure 3) shows the soil loading process under the condition of
vertical foundation pit
slope
When there is no water seepage or precipitation in the foundation pit,
the feeding mouth of the conveyor can be installed in
the corresponding position at the bottom of the foundation pit.
The universal soil feeder can shorten the transportation distance
and directly soil the bottom of the foundation pit to improve the
working efficiency.
Figure 4 shows the slope with inclination at the bottom of the
foundation pit directly
feeding soil
Section 2 , Device
config :
1. The active part: it can be divided into the walking part and the
working part. The walking part can be tracked or wheeled.
The working part of boarding mainly includes hoisting, lifting arm, control room, etc.
The boarding can be rotated 360 degrees (figure 1).The pulley that controls
the
working cable can be moved up and down on the boom (figure 2:1 -a).
2.
The driven machine part: from the motor installed on the
other side across the construction area. It is used to fix the
cableway and work cable across the construction area from the direction of the
main engine. From the choice of motivation according to the different
geological conditions and the construction strategy choice, can be used to move
along the construction area edge of caterpillar engineering machinery
modification, also can choose relatively stable portable device fixed pile,
pile composite ground can also choose (FIG. 3, 7, 8, 9, 10).
3.
Stabilization system device: In order to ensure the stability of
the host, the whole system is equipped with a stability protection device, with
separate type and built-in type, which can buffer the impact and prevent the
occurrence of tipping accidents.
4.
The winch cable: There are guide cableway cable
and front and rear traction cable, respectively wound on the winch. Control the
digging, lifting, falling, dumping of materials and other work terminals such
as digger, shovel, grab and hook.
5. The work
terminal: Different working terminals are selected
according to different materials and geological conditions of the site.
Generally, there are digger, shovel, grab, hook and other working terminals
(figure 5: working part).
6.
The loader hopper bucket: Select the size of the bucket according to the size of the
bucket.Generally,
the bucket is installed at the same time as the soil machine, transfer machine
and belt conveyor (figure 2:3).
7.
The belt conveyor: According to the needs of the site can be installed in the
front of the belt conveyor transfer machine, several transfer machine to the
material to a belt conveyor.The number of belt conveyors equipped with a conveying line
is determined according to the distance of transporting materials and the
volume of earthwork (figure 2:4).
8. The unloader: The final yard will soon be filled with earthwork,
so the feeding position needs to be moved frequently. If the
earthwork does not need to be moved to other places, only the
position at the end of the belt conveyor needs to be changed.
However, if it is necessary to continue moving the earth for a long distance,
a mobile buffer unloader can be used, which has an organic hopper and
can be loaded directly into the muck truck for removal.
Figure 5: four different
working terminal configurations
Section
3, Construction method:
At the beginning of construction, excavate with single machine
pull shovel, and every two single machine pull spatulas will
provide material to the receiving mouth of the conveyor alternately.
Arrange several single machine pull spatulas to excavate soil at
the same time according to the size of the construction surface.
The number of soil feeder, transporter and long distance belt
conveyor can be added according to the construction schedule (figure 1).
When there is seepage of underground water, the single-machine
pull shovel can be changed into the long-span combined pull shovel system for
long distance excavation.During the construction of the scheme, the active machine and
the slave motor are respectively set up at both ends of the construction area,
and the digger is controlled to excavate in the construction area. Therefore,
no matter whether water seepage occurs at the bottom of the excavated area, it
has no influence on the excavation work.Control the movement of the
bucket to move the earth at nearly the same speed on land as under water.
Assuming
that the diameter of the excavation range is 2000 meters, a one-time erection
span of 2000 meters is adopted, extending from near to far, section by section,
and finally reaching 2000 meters.
According
to the engineering amount, multiple sets of combined system construction can be
set up simultaneously (figure 2). Each set of system is equipped with a feeder,
and every two or three receivers feed materials to a conveyor. The feeder
concentrates the materials to supply the long-distance conveyor to the final
material field.
Section
4, Attention matters:
1. Before
the construction, visually inspect and analyze the material sampling in the
excavation area so as to determine the type and size of the bucket, bucket,
grab, etc.
2. Before
the construction starts, it is necessary to investigate the hydrological
situation of the construction area. If the groundwater level is high, it is
possible to set up a large-span combined pull shovel to excavate the upper soil
system for construction.
3. During
construction in the pit, the slope of the foundation pit should not be too
steep to avoid affecting the movement of the main engine.
4. The
use of single machine pull shovel soil work, two people a machine.
5.
When using the long-span
combined pull shovel to excavate the integrated system of upper soil, groups of
four shall work together.
6. The
selection of the supporting device of the large span multi-purpose soil loading
system is based on the principle of stability priority and convenient movement.
7. Separate
type counterweight in the choice, also in line with the principle of stability
priority, convenient movement.
8. The
distance between the two mainframes should not affect the rotation of the
lifting arm.
9. When
two single machines turn to dump materials, they must turn to dump materials
from both sides of the receiving mouth and keep the time difference between one
bucket digging and the other dumping.
Closing:
The program description is a general technical program
description that is not specific to a specific project. When making a plan for a
specific project, it is necessary to prepare the actual project construction
plan using universal soil-topper on the premise of drawing, project objective
plan or bidding document provided by party A.
Special tip: For the project plan wanders imitation
construction, without our technical staff guidance, will occur major
man-machine accident. There's a precedent!